The tower here is R6, still under construction, not R5, which completed in 2025, with studios from AED 728,505 and golf views. R6 is a 20-storey building running studios to three bedroom apartments, looking over the community golf course.
If you have been searching “Al Ghurair Residence 5” or “Living Legends Phase 5”, read this first.
Phase 5 contains more than one tower. Amer Al Ghurair’s own website states that R5 was completed on schedule in 2025 and has gone through final inspections, authority approvals and unit handovers. The tower in this listing is R6, which is a different building in the same phase and is still under construction.
So if someone quotes you a handover that has already happened, check which tower they mean. Ask us to confirm the tower reference on your SPA before you pay anything.
Phase size, unit mix, project number and construction progress are from the Dubai Land Department register; the R5 completion statement from Amer Al Ghurair’s own website. Both read on 23 September 2026.
Homes are described with fitted kitchens, smart-home features and floor-to-ceiling windows. Ask us for the floor plan of the specific unit and which floors still have golf-facing views.
Our records show Q3 2028. The Dubai Land Department registers Phase 5’s completion as 31 March 2025 — a date that has passed while the phase stands at 48.89% built. That registered date almost certainly relates to the phase’s original programme, and R5 has since been handed over while R6 continues.
Because the published dates do not line up, we will not give you a date we cannot stand behind. Get the handover date for tower R6 written into your SPA, and ask us for the developer’s current construction report.
Amer Al Ghurair publishes no payment schedule for this tower, so terms are on request and depend on the unit and the release. Ask Platinum Square for the developer’s written schedule rather than relying on a portal figure.
Living Legends is a seven-phase master community of towers and villas around a golf course in Wadi Al Safa 3. Buying into one phase means living beside the others, so their status matters. From the Dubai Land Department register:
Three phases are finished and occupied, which means the community, the roads and the golf course already exist — you are not buying into an empty plot. It also means you will be living next to active construction for some years while Phases 4, 5 and 6 finish. Both facts are worth weighing.
Phases 1, 2, 3 and 7 were developed by Tanmiyat Global; Phases 4 and 5 by Amer Al Ghurair; Phase 6 by Dawn Real Estate Development.
Our listing records a swimming pool, gym, kids’ play area, landscaped gardens, BBQ area, walking trail, running track, sports court, basketball court and yoga space, with rooftop amenities in the tower. The wider Living Legends community is built around its golf course and is gated and secured.
Living Legends sits in Wadi Al Safa 3, Dubailand, close to Global Village, IMG Worlds of Adventure and Al Barari, with access from Sheikh Mohammed Bin Zayed Road (E311) and Emirates Road (E611).
It is a self-contained, gated community rather than a tower on a main road — which is the appeal. The trade-off is that it is a drive from Downtown and the Marina, and there is no metro station on the doorstep.
In the gated Living Legends community, Wadi Al Safa 3, Dubailand, Dubai — near Global Village, IMG Worlds of Adventure and Al Barari, off Sheikh Mohammed Bin Zayed Road.
Amer Al Ghurair Real Estate Development (DLD project #1324). You will also see the buildings called Al Ghurair Residence.
They are two towers in the same phase. Amer Al Ghurair states R5 was completed in 2025 and handed over. R6, the tower in this listing, is a 20-storey building still under construction.
Our records show Q3 2028 for R6. The DLD registers the phase’s completion as 31 March 2025, a date now passed while the phase sits at 48.89% built. Get the date for your tower written into the SPA.
The developer publishes none, so terms are on request. Ask us for the written schedule.
Studios from 486 sq ft, one-bedroom from 648 sq ft, two-bedroom from 946 sq ft and three-bedroom from 1,408 sq ft. Across the whole phase the DLD registers 335 studios, 307 one-bed, 188 two-bed, 86 three-bed and 12 four-bed homes.
Studios from AED 728,505, one-bedroom from AED 1,056,634, two-bedroom from AED 1,396,949 and three-bedroom from AED 2,253,184.
Seven. Phases 1, 2 and 3 are complete and occupied; Phase 7 is 91.88% built, Phase 6 76.73%, Phase 4 62.08% and Phase 5 48.89%.
Yes — the community is built around a golf course, and golf-facing apartments are the premium units in the towers.
Yes. It is a freehold community, so buyers of any nationality can own outright and register with the Dubai Land Department.
Platinum Square Real Estate is a Dubai brokerage working across off-plan and ready property. Contact us for Living Legends Phase 5 floor plans, confirmation of the tower, golf-view availability, the written payment schedule and the latest construction report.
Kúpa alebo prenájom vo Wadi Al Safa 3: súčasť komplexu Dubailand Residence Complex v Dubaji – rýchlo rastúcej zóny s cenovo dostupnými apartmánmi a radovými domami a rýchlym napojením cez Emirates Road / E311 na Silicon Oasis, Arabian Ranches a Global Village.