//
Orientačný prepočet, kurz ECB k 24. 9. 2026. Záväzná cena je uvedená v AED. Bankové poplatky za prevod a výmenu meny nie sú zahrnuté a zvyčajne predstavujú približne 1–3 %.
The DLD completion date of 31 May 2025 has passed with the building 19.7% built — 95 homes, 3 beds from AED 21,904,000. Platinum Square Real Estate sells 3, 4 and 5 bedroom residences in Cavalli Couture, Al Wasl.
At this price point you are entitled to the uncomfortable number first. The Dubai Land Department registers completion for 31 May 2025. It is now late September 2026, and the same register records the project at 19.7% complete, with construction started on 30 March 2023.
Our feed carries Q1 2027. We have no basis to endorse that date or to replace it: what the public register shows is a project that is a fifth built, more than a year past its registered date, and still Active rather than cancelled.
None of that means the building will not be delivered — Damac completes a great deal of what it starts, and large branded projects routinely reschedule. It does mean that on a purchase starting at AED 21.9 million you should be asking for: the developer’s current written handover date, the previous ones, the delay and compensation clauses in the sale and purchase agreement, the escrow account for project 2459, and a dated site progress report. If those are not forthcoming in writing, that is information too.
Developer: Damac — registered with the Dubai Land Department for this project as Damac Business Real Estate Co. L.L.C
Brand: Roberto Cavalli
DLD project number: 2459 — status Active
Location: Al Wasl, Dubai — at the entrance of the Dubai Water Canal
Total units (DLD): 95, all residential — 57 three-bedroom, 24 four-bedroom, 12 five-bedroom, 2 six-bedroom
Plot area (DLD): 50,370.98 sq m
Construction progress (DLD): 19.7% complete
Registered with DLD: 11 October 2022; construction started 30 March 2023
Completion registered with DLD: 31 May 2025 — passed. Our feed carries Q1 2027.
Payment plan in our feed: 60/40
Amenities in our feed: swimming pool, gym, landscaped gardens, restaurant, retail, concierge service, security
Status: Off-plan, under construction
3 bedrooms — 3,920 sq ft, from AED 21,904,000 (about AED 5,590 per sq ft)
4 bedrooms — 5,136 sq ft, from AED 27,360,000 (about AED 5,325 per sq ft)
5 bedrooms — 7,372 sq ft, from AED 40,974,000 (about AED 5,560 per sq ft)
DLD figures were read from the Project Status Enquiry service on 25 September 2026; prices and sizes are from the current feed and change. Platinum Square confirms both in writing before you reserve. Rates per sq ft are our own arithmetic.
The registered mix is unusually top-heavy: 57 three-bedroom, 24 four-bedroom, 12 five-bedroom and two six-bedroom residences, on a 50,371 sq m plot. There is no studio, no one-bedroom and no two-bedroom anywhere in the building. That is a deliberate positioning — this is a small collection of very large apartments rather than a tower.
Pricing runs at roughly AED 5,300–5,600 per sq ft across all three types we list, which is remarkably flat: the four-bedroom is actually the cheapest per foot. In buildings where the rate per foot barely moves with size, the premium is usually in floor level and canal aspect rather than in the unit type, so ask which floor and which outlook each quoted price refers to.
60/40 in the current feed — 60% across construction and 40% on completion. Read that against the construction position above: on a project 19.7% built and past its registered date, when the construction instalments are triggered matters enormously. Ask whether they are tied to milestones or to calendar dates, and get the schedule in writing.
Registered with the DLD for 31 May 2025 (passed); our feed shows Q1 2027. A registered completion date is a date on the developer’s file, never proof of handover. See the first section.
The feed lists a swimming pool, gym, landscaped gardens, a restaurant, retail, concierge service and security, and flags the project as branded. For a Roberto Cavalli residence the interiors specification is the substance of the brand, so get it as a contract annexe rather than as renders.
Al Wasl, at the entrance of the Dubai Water Canal — between Jumeirah and Business Bay, a short distance from Downtown. Canal-front plots in Al Wasl are finite and rarely come to market, which is the durable part of the value case here regardless of the delivery timetable. We do not publish drive times we have not measured; ask and we will send current routing.
A buyer who wants a very large branded apartment on the canal and is treating the purchase as a long-term asset rather than a dated delivery. Ninety-five residences on a plot that size, in a location that cannot be replicated, is the argument.
It does not suit a buyer working to a move-in date, or anyone who needs the certainty of a completed product — at which point the secondary market for finished canal-front apartments is the better conversation, and one we are happy to have instead.
Ask for the current written handover date and every previous one.
Read the delay and compensation clauses in the sale and purchase agreement.
Ask for the escrow account for project 2459 and pay only into it.
Ask whether the 60% construction instalments are milestone-linked or date-linked.
Get a dated site progress report, not a render.
Get the Roberto Cavalli interiors specification as a contract annexe.
Confirm which floor and which canal aspect the quoted price refers to.
Ask for the service charge estimate for a branded building of 95 large units.
A 95-residence branded development by Damac with Roberto Cavalli, in Al Wasl at the entrance of the Dubai Water Canal. It is registered with the Dubai Land Department as project 2459.
Al Wasl, Dubai, on the Dubai Water Canal.
Damac. The DLD registers the project entity as Damac Business Real Estate Co. L.L.C. The brand partner is Roberto Cavalli.
Completion was registered with the DLD for 31 May 2025 and that date has passed; the register showed the project 19.7% complete in September 2026. Our feed carries Q1 2027. Ask the developer for the current written date.
19.7% complete on the DLD Project Status Enquiry, read on 25 September 2026.
60/40 in our current feed. Ask whether the construction instalments are tied to milestones, and get the dated schedule.
3 bedrooms from AED 21,904,000 (3,920 sq ft), 4 bedrooms from AED 27,360,000 (5,136 sq ft) and 5 bedrooms from AED 40,974,000 (7,372 sq ft) in the current feed.
The DLD registry records two six-bedroom residences in the building, alongside twelve five-bedroom. Ask us whether either of the six-bedroom homes is available.
95: 57 three-bedroom, 24 four-bedroom, 12 five-bedroom and 2 six-bedroom. There are no studios, one-bedroom or two-bedroom apartments.
We do not publish yield or appreciation figures we cannot source. What we can put in front of you is the DLD construction record, the registered dates, comparable canal-front resale prices, and the contract terms — and at this price those matter more than any projection.
Kúpa alebo prenájom v Al Wasl: pás City Walk, BoxPark a Al Safa vo vnútornom Jumeirah – peší, dizajnovo ladený okrsok nízkopodlažných apartmánov a víl s butikovými obchodmi, reštauráciami a parkom Safa Park pár minút od Downtownu.


